Zhangjiagang City Hontime Construction Machinery Co.,Ltd.
|
Gold Index: 6224
Place of Origin: | Guangdong, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
Diesel Concrete Mixer With Pump Can Only Us JZC350 Mixer When Concrete Pump Fault
Diesel concrete mixer with pump performance parameters
Item | Unit | HBT1506JZC350 |
Pump Max Output | m³/h | 15 |
Max. Pressure on Concrete | MPa | 6 |
The type of distribution valve | S tube valve | |
delivery cylinder | mm | 180×800 |
main oil cylinder bore/Rod diameter x stroke | mm | Φ90/Φ65×800 |
Oil tank capacity | L | 250 |
Outlet opening diameter | mm | Φ150 |
Inner dia. of delivery pipe | mm | Φ125 |
Diesel model | F3L912(DEUTZ) | |
Diesel power | KW | 36 |
Max. diameter of aggregates | mm | 40 |
Pulling speed | Km/h | ≤8 |
Maximum delivery Horizontal distance | M | 150 |
Maximum delivery Vertical distance | M | 30 |
Mixer Type | TOPLL | JZC350 |
Capacity of charge Hopper | L | 560 |
Capacity of discharge Hopper | L | 350 |
Water pump motor control |
| Electromagnetic clutch |
Diameter of drum | mm | 1440 |
Drum rotary speed | rpm | 15 |
Charge hopper load up time | s | 6 |
Charge hopper unload down time | s | 4 |
mixing time | s | 45-60 |
Tread distance | mm | 2250 |
length ×width ×height | mm | 5500×2300×2700 |
Weight | Kg | 4300 |
Packing quantity (20 foot) container |
| 1 |
Description:
Diesel engine is on the rotary platform, with three different optional position: dragging, working and shipping container position. Working position is away from the hopper, avoid diesel close to the pollution source-------loading hopper, to increase reliability, while expanding loader working space. Dgging position close to the machine body, the focus is adjusted to the median of two wheels, and reduce the cross section of the transport process of size, reduce the transport road width.Shipping container position to ensure the machine just enter a standard 20 foot container without dismantling.
Applications:
it is combined by the traditional mixing and the traditional concrete pump together, you could tail it by a truck or forklift quickly from a site to the other sites, so the efficiency of mixing concrete pump can be up 4 – 6 times than the traditional mixing and the traditional concrete pump.
Such as: it is usually seven days between two floors of the intervals in the construction site of china, This is the concrete sets up the intensity of time necessary to maintain, during the time, the traditional mixing and the concrete pump have had a rest, because the cost and time is too more to move its, only to stop and waiting. But diesel concrete pump mixer will been moved and used quickly to other three or four sites during the same time. This is diesel concrete pump mixer value.
Diesel concrete pump mixer is suitable for all kinds of dispersed locations, less construction, longer distance from site to commodity concrete agitate plant. For example: 10 layer below the group main building structure, building and underground garage floor, civil construction of inclined roof, small bridges, tunnels, water conservancy slope, small river locks and boat lock, electric power communication tower base, small wharf, mine construction, concrete roadway maintenance field sites scattered, engineering the quantity is less, the commodity concrete batch plant is not willing to do or they do not economic construction, concrete construction project site mixed.
Diesel concrete pump mixer is with the rapid and flexible, mobile convenience, speed, labor saving features.
Competitive Advantage:
diesel engine is arranged on the rotary platform, with three different optional location: dragging location, working location and shipping container location. Work location is away from the hopper, avoid diesel close to the pollution source-------loading hopper, to increase reliability, while expanding the feeding of loader working space, reducing the demand for construction space. Dragging location close to the machine body, the focus is adjusted to the two rounds of the median, and reduce the cross section of the transport process of size, reduce the transport requirements of the road. Shipping container position to ensure the machine without dismantling the state, just enter a standard 20 foot container, which reduces shipping costs, and without the need for personnel on-site installation at the destination.
Zhangjiagang City Hontime Construction Machinery Co.,Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)